Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3964.35
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Dec 23, 2020     Panel assembly; wire lacing; external power cable - (3.2 hours)       Category: Instrument Panel
1. Continued wire-lacing various harnesses, mostly on the wings this time.
2. Wired up the Powerlet plug that will provide external power for maintenance purposes. Used 25 feet of 12 AWG, 2-conductor wire that will eventually connect to my 13.8V, 25A bench power supply.
3. Re-installed all the items on the right instrument panel, after it was re-painted and relabeled. (This time I took it really slow and taped off EVERYTHING to prevent damage...) I am back on track with the instrument panel now.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.